Simulated workplace
Business system
Permit and Isolation Register
Records every permit to work and its isolations from request through issue, work, restoration and close out.
Fields in this system
Permit numbertext
Date issueddate
Siteselect
Plant tagtext
Permit recipienttext
Isolation pointstextarea
Statusselect (status)
Notestextarea
Scenarios that use it
Complete the field operator round and operational checksStart and load a gas turbine and heat recovery steam generator after a tripIsolate multiple energy sources and repair a cooling tower fan gearboxDiagnose and repair a drum level transmitter faultFault find a pitch system and complete a six monthly turbine servicePlan the GT2 combustion inspection outageAudit the permit system after two near missesDesign and run a critical incident exercise for a transformer fire