Shift Handover Report Template

TemplateControlled document
PGN-TPL-061
v1.3
Document ownerOperations Manager
Version1.3
Approved20 August 2026
Next review20 August 2027
StatusCurrent

Purpose. Unit controllers use this template to hand over plant status, open permits, defects and operating instructions to the incoming shift.

1.When to use this template

Complete this report in the last 30 minutes of every shift and walk the incoming controller through it in person. The report covers all three sites. An incomplete or absent handover is a reportable near miss.

2.Plant status

State the load, mode and any abnormal condition of each gas turbine, the steam turbine, the wind farm and the hydro unit. Record any plant out of service and the expected return.

3.Permits and isolations

List every open permit and isolation with the plant affected and the expected restoration. Highlight any isolation that affects the ability to start or load a unit.

4.Defects and instructions

List new defects raised during the shift, standing instructions from the Operations Manager and any market or network operator instruction in force.

5.Sign off

Both controllers sign the report. The outgoing controller must not leave until the incoming controller has signed.

6.Complete the template

PGN-TPL-061 v1.3 · CAQA Powergen StationUncontrolled when printed. Simulated document created by CAQA for training and assessment.