Scenario · Wind and Hydro Operations

Carry out dam safety surveillance and prepare the monthly report

You are the Hydro Operator at the Mitta Ranges station.

Intermediate3 to 4 hours8 tasks
Home/Scenarios/Carry out dam safety surveillance and prepare the monthly report
The situation

What has happened

Gallery drain D-14 at the Mitta Ranges concrete gravity dam has increased from 0.4 to 0.9 litres per minute over two months. The reading is below the alert level but the trend concerns the dam safety engineer, who wants a full instrument reading set and a written report this month. The storage is at 71 percent after winter rain and the hydro unit is out of service for governor work under OUT-26-09, so environmental flow is being released through the bypass valve. The weekly walkover, the piezometers, the seepage weirs and the survey points are all due. Two people must attend the gallery and the downstream toe.

Your brief. Complete the walkover inspection and the full instrument reading set to the dam safety surveillance procedure, record everything in the Operations Log, update the hazard in the incident register, raise or update the work order for D-14 and prepare the monthly surveillance report for the Renewables Manager.
Read the work request in your inbox
Tasks

Deliverables

  • Inspection checklist and reading schedule
  • Operations Log entries
  • Updated incident register and work order records
  • Monthly surveillance report
For trainers and assessors

Units of competency

Current on training.gov.au for the Electricity Supply Industry - Generation Sector Training Package as at 10 September 2026.

UEPOPS144Undertake dam safety surveillance
UEPOPS042Implement dam safety surveillance procedures
UEPOPS006Collect and analyse hydrological and meteorological data
UEPOPS018Conduct water conveyance and control
UEPOPS061Monitor and implement environmental site plans and procedures

Qualifications

UEP30322Certificate III in ESI Generation
UEP40122Certificate IV in ESI Generation
Assessor notes

What to look for

Evidence guide

Look for a walkover that covers every dam element in the procedure, readings compared to the previous reading and the alert level, correct escalation of the D-14 trend without overstatement, a report that separates observation from conclusion, and knowledge of the post-event triggers and the alert level response. The environmental flow must be logged, not assumed.

The student's evidence summary lists every record they created or changed in the systems named above, their notes and the tasks they ticked. Verify it against the deliverables and your own assessment tool.